As planned the contractor from the Council came yesterday with truck of 6-8 m3 topping and a bobcat and levelled the bowl at the Bickleigh Vale Road turning circle. They have built up the Wimborne side so that run-off will flow into the gutter on the Abbotsley / Littlewood side and have checked the fall with architect levels. Today, They came back with a rammer and packed it down.
This completes the work outlined in our earlier blog posts (road-maintenance-problem-and-solutions.html and december-topping-and-grading.html) Looks pretty good!